I'm onto my 2nd 80% project and already ****ed up.
Made the assumption that a quarter turn would be 0.006" and had 0.048" of total material to cut. I probably made half a turn instead of quarter a few times or something, because when I pulled out at 7 cuts I was 0.006" overcut. After deburring and very light stoning with 800 grit I'm at 0.007-0.008" loose relative to my slide (was aiming for 0.003"
)
Anyways I'd like some guidance on methods for getting a super snug fit. I have the slide started about half an inch, but there's interference that stops it. After applying layout dye (dekims) I see that the frame rail's deck's corners are rubbing. Is there a guide or resource that tells what kind of interference causes each mark?
IE: if the rail's show top/bottom marks, the rails need to be widened etc.
My measurements show that my gun should fit together, but it hangs up about half an inch in. How should I proceed? I don't want to blindly lap/file as that's how my first frame got loose/rickety
TIA
Made the assumption that a quarter turn would be 0.006" and had 0.048" of total material to cut. I probably made half a turn instead of quarter a few times or something, because when I pulled out at 7 cuts I was 0.006" overcut. After deburring and very light stoning with 800 grit I'm at 0.007-0.008" loose relative to my slide (was aiming for 0.003"
)Anyways I'd like some guidance on methods for getting a super snug fit. I have the slide started about half an inch, but there's interference that stops it. After applying layout dye (dekims) I see that the frame rail's deck's corners are rubbing. Is there a guide or resource that tells what kind of interference causes each mark?
IE: if the rail's show top/bottom marks, the rails need to be widened etc.
My measurements show that my gun should fit together, but it hangs up about half an inch in. How should I proceed? I don't want to blindly lap/file as that's how my first frame got loose/rickety
TIA

Comment