I sent my PM7 to Robar to have the sights changed and have the reliability package done but ended up having some other stuff done.
Work done:
Front strap checkering
WC ambi thumb safety installed
Harrison Design rear sight installed (also needed to install taller front sights)
Reliability package (throat barrel, polish feed ramp, tune extractor, polish breech face, lower ejection port & test fire)
NP3 Plus refinishing internals and externals
Estimated lead time was 3 months but they sent it back after 2 months.
Before:
IMG_0884.jpg
After:
FullSizeRender-2.jpg
FullSizeRender-3.jpg
FullSizeRender.jpg
FullSizeRender-1.jpg
Work done:
Front strap checkering
WC ambi thumb safety installed
Harrison Design rear sight installed (also needed to install taller front sights)
Reliability package (throat barrel, polish feed ramp, tune extractor, polish breech face, lower ejection port & test fire)
NP3 Plus refinishing internals and externals
Estimated lead time was 3 months but they sent it back after 2 months.
Before:
IMG_0884.jpg
After:
FullSizeRender-2.jpg
FullSizeRender-3.jpg
FullSizeRender.jpg
FullSizeRender-1.jpg

Comment