Assumptions for parts kit
-Already demilled
-Previously headspaced with original barrel
-Has a fixed stock
-All number match
Questions
1) How long would it take to build an AK if it is built on a 100% receiver (NDS)?
2) How long would it take to build an AK if it is built from a bent flat?
-Already demilled
-Previously headspaced with original barrel
-Has a fixed stock
-All number match
Questions
1) How long would it take to build an AK if it is built on a 100% receiver (NDS)?
2) How long would it take to build an AK if it is built from a bent flat?





) event. Too many variables with random bargain bin parts.
Comment