    SigSauer P320 Preventative Maintenance & Part Replacement Schedule

    Having recently completed Sig's P320 Armorer Course, I wanted to share the Factory Preventative Maintenance & Part Replacement Schedule with you...


    Preventative Maintenance, Operator Performed:
    Clean & Lubricate:
    (a) After every firing or exposure to water, chemicals, dirt, or other contaminants.
    (b) Monthly when carried as a duty weapon.
    (c) Annually during storage.

    Function Check:
    Whenever disassembled and reassembled.


    Preventative Maintenance, Armorer Performed:
    (a) Field Strip & Inspection for proper Operator Maintenance: Annually
    (b) Detailed Disassembly & Inspection: Every 3 years or 5,000 rounds fired.




    Part Replacement Schedule, Operator Performed:
    Recoil Spring:
    (a) Full Size: 10,000 rounds fired.
    (b) Compact: 5,000 rounds fired.
    (c) Sub-Compact: 5,000 rounds fired.

    Magazine Spring: When the magazine fails to lock the slide open.

    Barrel: If the pistol exhibits key-holing or unacceptable accuracy.


    Parts Replacement Schedule, Armorer Performed:
    Extractor Spring: 20,000 rounds fired.
    Extractor: 20,000 rounds fired.
    Striker Assembly: 20,000 rounds fired.
    Takedown lever: 20,000 rounds fired.
    Slide Catch Lever: 10,000 rounds fired.
    Slide Catch Lever Spring: 10,000 rounds fired.
    Slide Catch Lever Post: 10,000 rounds fired.
    Trigger Bar Spring: 10,000 rounds fired.