I got a good start on the new reloading bench today
The top will be two layers of 3/4" mdf, glued and screwed down to the 2x6 framework.
With my 300lb buddy jumping up on the bench, it only dropped down 1/8" at the midpoint between two of the supports.
The top will be two layers of 3/4" mdf, glued and screwed down to the 2x6 framework.
With my 300lb buddy jumping up on the bench, it only dropped down 1/8" at the midpoint between two of the supports.

Comment